Archives for: March 11th, 2015

Why Buy a Modular Process System Unit

Written by Welcome on March 11, 2015

Power Plant Examples of SCR DeNOx Modularized Fabrication When a process system needs an original or replacement unit, the two main methods of construction today are “stick-built” (on-site/field construction) and “modularized fabrication” where outsourced shop-built units arrive on site ready to “plug into” the process system. Much like the new tankless water heater systems available today, […]