Archives for: November 18th, 2017

IFS Provides McDermott International With the Instrument & Utility Air Package

Written by Welcome on November 18, 2017
BP Angelin Topsides Platform

IFS provides McDermott International (MDR) with the design, materials, fabrication, testing, and inspection of the Instrument & Utility Air Package for the British Petroleum (BP) Angelin Development Project. The project involves the development of a six-slot wellhead platform which is Normally Unmanned Installation (NUI) in Angelin area located approximately 25 miles (40 km) off the […]