Your Engineered-to-order-Modular Process System in 6 Easy Steps

Your Engineered-to-Order Modular Process System
in 6 easy steps.

Want to learn how IFS can save you time and money with a modular system?

Systems upgrades are a large-scale investment. Rest assured our experts have thoughtfully mastered how to maximize the workflows of each step.

Using a modular construction process saves 25 percent to 50 percent more time than a traditional “stick-built” construction method. With minimum site disruption, environmental impact and safety risks, partnering with IFS saves your plant money, time and convenience.

This FREE GUIDE will show you our six-step implementation process:

  • Launch Phase
  • Design Phase
  • Fabrication Phase
  • Quality Assurance Phase
  • Transport Phase
  • Start-Up Phase

Beyond Implementation

– With the Field Maintenance Services Contract, IFS becomes your partner in operational success.

  • Vibration Analysis and Condition Monitoring
  • Ludeca Rotalign Laser Alignment
  • Thermal Imaging
  • Equipment Evaluation
  • Start-Up/Shutdown Procedures
  • PSVs and Ammonia Leak Detectors Calibration